Posts Tagged ‘600’
Winter 2k11 Build Off Winner – Knifemaker
The time has come for yet another CF winter buildoff, so we thought we would take the time to look back at our most recent winner and owner of the amazing carbon clad creation you see.
I took a moment to ask Knifemaker what makes him tick and the thought process that went into his Winter Build Off Winning Bike.
Lance A. Lewsader: What was your inspiration behind this build?
Chris (Knifemaker): I actually stumbled across a picture of a Honda VT1000 Hawk Concept and absolutely loved it.
http://idata.over-blog.com/2/78/64/83/vtr-concept-4.jpg
I really wanted to build a V-Twin bike, as all my other bikes have been twins, but when the F2 fell in my lap for $500 I couldnt pass it up especially after seeing Fathead03′s F2 build-off thread. It challenged what I thought of as far as custom fabrication goes, and I really wanted to give it a try.
LL: How many hours would you say you have in this build?
Chris: It is really hard for me to gauge hours, but I have been working on the bike since last June. I would say 1000+ hours of work would be conservative. Especially if you include all the machine time, fabricating, carbon fiber work, mechanical work, and finishing.
2008/2009 Winter Streetfighter Motorcycle Buildoff part 2 – People’s Choice Winner
This year’s People’s Choice Award went to Brian “Fathead_03″ Kammers, of Oroville, WA. Brian started with a CBR600F3 that he had picked up a year earlier. He said the project sat on the back burner until the ’09 Build-off got him in gear. Early in the build-off, Brian started with a new subframe, some tank mods and rough fiberglass work. The real work, though, didn’t begin until February, at which point he had settled into a new location and a bigger work area. After some reflection as to where the CBR was heading, he realised he wasn’t happy with his original mock-up. He made some deals with other members of the forum, and scored some suspension upgrades from a late model 600RR. Forks, swingarm, wheels brakes were all upgraded to RR pieces. With the bike on the work bench, sparks began to fly. Factory shock mounts were removed and new ones made to fit the Pro Link setup. The 600RR swingarm had to be narrowed to fit the F3′s frame rails and the first adaptation of the subframe was cut away for a new approach.







