So the first part was the STRIP.
I started with the frame, took off the rear suspension, forks, tank and ripped out the wiring.
Pulled the motor out and set up two piles.
The one pile was all the parts that I was going to keep and use on the build, the other pile was all the parts that I needed to throw away.
In doing so I was commited to the hilt. If I did not go ahead I would then effectively be throwing the whole thing away.
So I kept the frame, carbs, wiring, motor and a few sundries to help along the way.
I started with the frame, took off the rear suspension, forks, tank and ripped out the wiring.
Pulled the motor out and set up two piles.
The one pile was all the parts that I was going to keep and use on the build, the other pile was all the parts that I needed to throw away.
In doing so I was commited to the hilt. If I did not go ahead I would then effectively be throwing the whole thing away.
So I kept the frame, carbs, wiring, motor and a few sundries to help along the way.